Home > Products > Multi-Stage Frac System > King Frac System
King Frac System

The King Frac System delivers unprecedented flexibility for multistage completions. There is no practical limit to the number or spacing of stages. It also isolates and stimulates multiple stages in a single trip on coiled tubing and is typically used in Cased hole. This Hydraulic Jet Frac System works in both horizontal and vertical wellbores. Tool string depth is correlated to desired perforation depth by using a mechanical casing coupling locator. Starting with the lowest stage, the Packer is set to isolate the zone from wellbore below the packer. Then the abrasive slurry is pumped down the coiled tubing string to the Hydraulic Jet Unit. The high-velocity jets cut through the casing and cement and into the formation. After perforating, a leading-edge fluid such acid can be circulated or injected down the coiled tubing/casing annulus. Then the frac is also pumped down the annulus. If screenout occurs, excess sand can be quickly reverse circulated out. Finally, a pull on the coiled tubing unsets the packer, which is then moved up to the next perforation point, where the sequence is repeated.



Features and Benefits


  Simple design and most efficient 

  Unlimited stages and spacing

  Precise frac location

  Water and chemical reservation

  Unrestricted, production-ready wellbore after frac

  When annular fracturing, the coiled tubing serves as a deadleg for monitoring actual pressure at the frac point to assist in adjusting pad size, sand concentration and ramp, fluid viscosity and pump pressure in real time

  When screenout occurs, excess sand can be quickly reverse-circulated out without tripping out of the hole

  Equalizing valve allows movement without flowing the well

  Hydraulic disconnect unit enables emergency release

  Less hydraulic horsepower needed

  5 minutes between Fracs. The simple operation of the Multistage Unlimited system cuts the time between fracs to as little as 5 minutes.

  Less equipment, less exhaust, smaller footprint. Environmentally friendly fracturing









PRODUCTS
Dissolvable Frac Plugs
Packers
Packer Accessories
Flow Control Tools
Safety Valve
Multi-Stage Frac System
Anti-wear Protector
ABOUT US
Company Profile
API Certificates
CONTACT US

Tel: +86 139 2462 6365

Email:  george.chang@petrostartools.com

Add: 1300 Post Oak Blvd Suite 770,Houston, TX 77056 USA


© 2021 Petrostar Tools and Services Inc. All rights reserved.